<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: 521 with CP 8231 North Departing Welland for Kinnear.</title>
	<atom:link href="http://www.railpictures.ca/upload/521-with-cp-8231-north-departing-welland-for-kinnear/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Fri, 08 May 2026 19:03:30 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: NiagaraMike11</title>
		<link>http://www.railpictures.ca/?attachment_id=56176#comment-63863</link>
		<dc:creator>NiagaraMike11</dc:creator>
		<pubDate>Sat, 08 Mar 2025 16:14:37 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2025/03/T-521-CP-8231-Hewitt-Jan-19-1992-WM.jpg#comment-63863</guid>
		<description>Quite a consist-nice shot!</description>
		<content:encoded><![CDATA[<p>Quite a consist-nice shot!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=56176#comment-63849</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 07 Mar 2025 13:14:09 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2025/03/T-521-CP-8231-Hewitt-Jan-19-1992-WM.jpg#comment-63849</guid>
		<description>Indeed. Considering they added CTC to the Canal spur from Welland to Feeder (all removed), the Humberstone to Port Colborne also CTC, and the full triple tracking and double track Cayuga connector from Brookfield....

It lasted for the most part less than 20 years.</description>
		<content:encoded><![CDATA[<p>Indeed. Considering they added CTC to the Canal spur from Welland to Feeder (all removed), the Humberstone to Port Colborne also CTC, and the full triple tracking and double track Cayuga connector from Brookfield&#8230;.</p>
<p>It lasted for the most part less than 20 years.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: rsmith</title>
		<link>http://www.railpictures.ca/?attachment_id=56176#comment-63845</link>
		<dc:creator>rsmith</dc:creator>
		<pubDate>Thu, 06 Mar 2025 20:23:04 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2025/03/T-521-CP-8231-Hewitt-Jan-19-1992-WM.jpg#comment-63845</guid>
		<description>That is a monster signal bridge! The infrastructure that went in to relocate railway lines for the Welland Canal is mind boggling, especially considering how much of it that has since been removed!</description>
		<content:encoded><![CDATA[<p>That is a monster signal bridge! The infrastructure that went in to relocate railway lines for the Welland Canal is mind boggling, especially considering how much of it that has since been removed!</p>
]]></content:encoded>
	</item>
</channel>
</rss>
