<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: A good trip gone bad. UP 4066 wasn&#8217;t feeling well, and 135 stalled on the climb to Campbellville. The decision was made to double the hill. So after about 4 hours, 7028 is doing most of the work dragging 10000 tons at about 25mph as Orr&#8217;s lake Hill&#8217;s .9% grade looms. Happily, for what must be an exhausted crew(yes, they did get a lift from a road foreman to save some walking, but so many hand brakes to tie on&#8230;and then take off), they made it up the hill out of the Grand River Valley, and all the way to London&#8230;.where 7028 decided it was finished doing all the hard work and was rumoured to have a computer &#8220;meltdown&#8221; that put the rain in emergency&#8230;with no way to recover. Some days just go that way&#8230;..</title>
	<atom:link href="http://www.railpictures.ca/upload/a-good-trip-gone-bad-up-4066-wasnt-feeling-well-and-135-stalled-on-the-climb-to-campbellville-the-decision-was-made-to-double-the-hill-so-after-about-4-hours-7028-is-doing-most-of-the-work-drag/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sat, 11 Apr 2026 07:38:00 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
