<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: A unit train was just entering the connecting track which will take the empties across Hwy.28 and then connect to the Lac La Biche Sub. From there it is still a long trip north to Waterways. The siding at Kerensky was all a buzz with activity. The 3 tracks (main, siding &amp; elevator) in Redwater were being fluffed and folded, plus the main track from Redwater to Kerensky was receiving the same treatment (new ballast and ties, then leveled). Cab 79420 on the tail end.</title>
	<atom:link href="http://www.railpictures.ca/upload/a-unit-train-was-just-entering-the-connecting-track-which-will-take-the-empties-across-hwy-28-and-then-connect-to-the-lac-la-biche-sub-from-there-it-is-still-a-long-trip-north-to-waterways-the-sidin/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 30 Apr 2026 13:45:27 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
