<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: A westbound freight behind three of CP&#8217;s GMD GP38ACs rumbles west near Yonge Street along the North Toronto Sub.

Scan and editing by Jacob Patterson.</title>
	<atom:link href="http://www.railpictures.ca/upload/a-westbound-freight-behind-three-of-cps-gmd-gp38acs-rumbles-west-near-yonge-street-along-the-north-toronto-sub-scan-and-editing-by-jacob-patterson/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sun, 01 Nov 2026 05:07:23 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: RonaldB</title>
		<link>http://www.railpictures.ca/?attachment_id=60421#comment-71063</link>
		<dc:creator>RonaldB</dc:creator>
		<pubDate>Sun, 01 Nov 2026 05:07:23 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2026/10/JF_4798_02-wtrmk.jpg#comment-71063</guid>
		<description>I should add, C&amp;O vans were not used on the CP probably because they didn&#039;t meet the union&#039;s Collective Agreement stipulations. Power may or may not have changed at Powell, but CP vans were always run east on CP.</description>
		<content:encoded><![CDATA[<p>I should add, C&amp;O vans were not used on the CP probably because they didn&#8217;t meet the union&#8217;s Collective Agreement stipulations. Power may or may not have changed at Powell, but CP vans were always run east on CP.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: RonaldB</title>
		<link>http://www.railpictures.ca/?attachment_id=60421#comment-71062</link>
		<dc:creator>RonaldB</dc:creator>
		<pubDate>Sun, 01 Nov 2026 05:03:02 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2026/10/JF_4798_02-wtrmk.jpg#comment-71062</guid>
		<description>This is an interesting shot John. I&#039;m wondering if the date might be a few months off? I ask that because this power was typical of the startup of C&amp;O trains 937 and 942. Sets of 3 were dedicated to this service. Three unit sets of C&amp;O power worked  alternating with CP power. I recall those trains starting later in 1973, or perhaps even into 1974.  
On the Windsor Sub, those trains originally ran into the newly constructed Powell sidings west of Walkerville Jct &amp; Walker Road. The trains came through the tunnel with C&amp;O crews who run them to Pelton Jct and then southward on the  C&amp;O and then westward into one of the Powell sidings. Those sidings were built one on either side of the Windsor Sub main track. The CP &amp; C&amp;O crews would switch power &amp; vans if I recall. The GP38ACs were always in a set of 3 at first. These were soon replaced with C424s &amp; other 4 axle units. 
Powell sidings were short lived owing to legal issues that I won&#039;t go into. The dual control switches were removed and the rails followed later. Thereafter, those trains ran into CP&#039;s Windsor Yard and were run east from there. 
  My memory on details might be a bit fuzzy, I was working the spareboard and only went to Windsor infrequently. so any corrections or additional would be appreciated.</description>
		<content:encoded><![CDATA[<p>This is an interesting shot John. I&#8217;m wondering if the date might be a few months off? I ask that because this power was typical of the startup of C&amp;O trains 937 and 942. Sets of 3 were dedicated to this service. Three unit sets of C&amp;O power worked  alternating with CP power. I recall those trains starting later in 1973, or perhaps even into 1974.<br />
On the Windsor Sub, those trains originally ran into the newly constructed Powell sidings west of Walkerville Jct &amp; Walker Road. The trains came through the tunnel with C&amp;O crews who run them to Pelton Jct and then southward on the  C&amp;O and then westward into one of the Powell sidings. Those sidings were built one on either side of the Windsor Sub main track. The CP &amp; C&amp;O crews would switch power &amp; vans if I recall. The GP38ACs were always in a set of 3 at first. These were soon replaced with C424s &amp; other 4 axle units.<br />
Powell sidings were short lived owing to legal issues that I won&#8217;t go into. The dual control switches were removed and the rails followed later. Thereafter, those trains ran into CP&#8217;s Windsor Yard and were run east from there.<br />
  My memory on details might be a bit fuzzy, I was working the spareboard and only went to Windsor infrequently. so any corrections or additional would be appreciated.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
