<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Amtrak Maple Leaf operating as V98 with AMTK 90 at Ash, Mile 38.7 Halton Sub.. Planned preparation work by Metrolinx for the Burloak Drive grade separation project and other maintenance tasks on the Metrolinx portion of the Oakville Sub. between Kerr St. and Burlington West has all VIA trains detouring via the Halton Sub. this weekend.</title>
	<atom:link href="http://www.railpictures.ca/upload/amtrak-maple-leaf-operating-as-v98-with-amtk-90-at-ash-mile-38-7-halton-sub-planned-preparation-work-by-metrolinx-for-the-burloak-drive-grade-separation-project-and-other-maintenance-tasks-on-the-m/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 07 May 2026 22:12:28 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=54610#comment-65031</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 20 Jun 2025 00:01:52 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/06/Halton-Sub.-Mile-38.7-Ash-V98-AMTK-90-June-15-2024-TJO-Photo-6ER.jpg#comment-65031</guid>
		<description>This shot is now ruined with the overpass. Good job.</description>
		<content:encoded><![CDATA[<p>This shot is now ruined with the overpass. Good job.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
