<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: An eastbound GO service, that could use its face washed, passes MP 331 on the Kingston Sub, May 12th, 2023.  The south track has been out of service for some time as part of the Lakeshore East line expansion.  This will be the location for the planned Gerrard station and interchange with the Ontario Line.</title>
	<atom:link href="http://www.railpictures.ca/upload/an-eastbound-go-service-that-could-use-its-face-washed-passes-mp-331-on-the-kingston-sub-may-12th-2023-the-south-track-has-been-out-of-service-for-some-time-as-part-of-the-lakeshore-east-line-ex/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 07 May 2026 18:15:44 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: ngineered4u</title>
		<link>http://www.railpictures.ca/?attachment_id=51947#comment-57225</link>
		<dc:creator>ngineered4u</dc:creator>
		<pubDate>Sun, 14 May 2023 18:01:38 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2023/05/GO-train_1432.jpg#comment-57225</guid>
		<description>I will be working just west of those smokestacks on Wed :-) .Actually that is considered #3 track that is out of service. Its only north and south if there are only two tracks. The GO train is now on the south track. The #1 track is out of service from the west plant at Danforth. All the tracks will ultimately be shifted to accommodate 6 tracks at this location. 2  for the Ontario Line and 4 for Metrolinx. Metrolinx is also planning a huge new station facility where the Don river and the Kingston Sub meet by Lakeshore Blvd.</description>
		<content:encoded><![CDATA[<p>I will be working just west of those smokestacks on Wed <img src='http://www.railpictures.ca/wp-includes/images/smilies/icon_smile.gif' alt=':-)' class='wp-smiley' />  .Actually that is considered #3 track that is out of service. Its only north and south if there are only two tracks. The GO train is now on the south track. The #1 track is out of service from the west plant at Danforth. All the tracks will ultimately be shifted to accommodate 6 tracks at this location. 2  for the Ontario Line and 4 for Metrolinx. Metrolinx is also planning a huge new station facility where the Don river and the Kingston Sub meet by Lakeshore Blvd.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
