<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Back in 2017, CP started upgrades to their infrastructure. Here, the railways employees were replacing signs and wooden planks for the crossing at Third Line. Sure enough, any time can be train time. CP train 650 heads east, with CEFX 1054 as the rear DPU passing by under the careful inspection of the crew.</title>
	<atom:link href="http://www.railpictures.ca/upload/back-in-2017-cp-started-upgrades-to-their-infrastructure-here-the-railways-employees-were-replacing-signs-and-wooden-planks-for-the-crossing-at-third-line-sure-enough-any-time-can-be-train-time/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 13 Aug 2026 15:34:24 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
