<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Belt Line:  With the days work nearly completed and Kinnear yard a few hundred feet away we see the Belt Line job emerging between the buildings at Main and Gage St. The train is taking the &#8216;signal&#8217; (facing the train) indicating crossing protection is operating normally. The signal displays a white flashing light &#8211; and are common throughout the Belt Line having been installed by the TH&amp;B.</title>
	<atom:link href="http://www.railpictures.ca/upload/belt-line-with-the-days-work-nearly-completed-and-kinnear-yard-a-few-hundred-feet-away-we-see-the-belt-line-job-emerging-between-the-buildings-at-main-and-gage-st-the-train-is-taking-the-signal/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Mon, 06 Apr 2026 14:01:18 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
