<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Canadian manufacturing is dead? Nope &#8211; tell that to Canadian Erectors &#8211; who had a load of formed steel products to come out of their Eastchester Ave plant. Note the switchback used, a very interesting track layout for sure. Not sure why the switch back even exists, you&#8217;d think the spur could just go in direct using the right of way as shown.. The lakeshore spur was recently (3-4 years?) cut back to about this point, formerly having ran under the QEW to customers on the north side of the highway.</title>
	<atom:link href="http://www.railpictures.ca/upload/canadian-manufacturing-is-dead-nope-tell-that-to-canadian-erectors-who-had-a-load-of-formed-steel-products-to-come-out-of-their-eastchester-ave-plant-note-the-switchback-used-a-very-interesting/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 16 Apr 2026 17:41:50 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: DoctaPinklaces</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-59218</link>
		<dc:creator>DoctaPinklaces</dc:creator>
		<pubDate>Sat, 18 Nov 2023 18:22:41 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-59218</guid>
		<description>Last cars I saw come out of here were August or September of 2020. Seems like another victim of Covid. Interesting enough they just finished rebuilding the loading area and realigned the tracks before they stopped service.</description>
		<content:encoded><![CDATA[<p>Last cars I saw come out of here were August or September of 2020. Seems like another victim of Covid. Interesting enough they just finished rebuilding the loading area and realigned the tracks before they stopped service.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-58098</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Thu, 03 Aug 2023 01:05:53 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-58098</guid>
		<description>This place was getting cars again in 2020 or 2021 but has since closed manufacturing as per receptionist. Seems they aren&#039;t doing too good.</description>
		<content:encoded><![CDATA[<p>This place was getting cars again in 2020 or 2021 but has since closed manufacturing as per receptionist. Seems they aren&#8217;t doing too good.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-27788</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Sat, 28 Jul 2018 20:40:49 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-27788</guid>
		<description>Btw i drove by here some weeks ago seems this plant not using rail service..... spurs covered and blocked with stuff now.</description>
		<content:encoded><![CDATA[<p>Btw i drove by here some weeks ago seems this plant not using rail service&#8230;.. spurs covered and blocked with stuff now.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15058</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Sat, 21 May 2016 22:16:46 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15058</guid>
		<description>fyi aii: http://www.niagarastructuralsteel.com/wp-content/uploads/2013/09/Niagara-Brochure.pdf</description>
		<content:encoded><![CDATA[<p>fyi aii: <a href="http://www.niagarastructuralsteel.com/wp-content/uploads/2013/09/Niagara-Brochure.pdf" rel="nofollow">http://www.niagarastructuralsteel.com/wp-content/uploads/2013/09/Niagara-Brochure.pdf</a></p>
]]></content:encoded>
	</item>
	<item>
		<title>By: BradKetchen</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15055</link>
		<dc:creator>BradKetchen</dc:creator>
		<pubDate>Sat, 21 May 2016 15:58:54 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15055</guid>
		<description>There&#039;s also a switchback in Hamilton at Parkdale Ave N just South of Burlington Ave E. Same thing, the spur could go right into the industry, a warehouse of some sort, without the switchback.</description>
		<content:encoded><![CDATA[<p>There&#8217;s also a switchback in Hamilton at Parkdale Ave N just South of Burlington Ave E. Same thing, the spur could go right into the industry, a warehouse of some sort, without the switchback.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15053</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Sat, 21 May 2016 12:36:20 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15053</guid>
		<description>Daniel, re: townline spur connection heard that rumour too. think about it: who will pay for it? its at least a half mile of new right of way and easements, construction and new track and would probably cost a half million to a million to build and this assumes they use the pine st lead, plus the costs of re-adding crossing protection on the pine st lead, if its even possible to put it back.

and for how many cars a year? 800? someone has to pay... transload might be cheaper.</description>
		<content:encoded><![CDATA[<p>Daniel, re: townline spur connection heard that rumour too. think about it: who will pay for it? its at least a half mile of new right of way and easements, construction and new track and would probably cost a half million to a million to build and this assumes they use the pine st lead, plus the costs of re-adding crossing protection on the pine st lead, if its even possible to put it back.</p>
<p>and for how many cars a year? 800? someone has to pay&#8230; transload might be cheaper.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Daniel Odette</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15036</link>
		<dc:creator>Daniel Odette</dc:creator>
		<pubDate>Fri, 20 May 2016 20:41:31 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15036</guid>
		<description>@craigandru, Trillium is now operating out of that yard by SLM recycling south of Brown Road. Green Road is just a deadline now (TR 110, 1842), and a recent addition includes stored tankers which extend down to Feeder Yard.</description>
		<content:encoded><![CDATA[<p>@craigandru, Trillium is now operating out of that yard by SLM recycling south of Brown Road. Green Road is just a deadline now (TR 110, 1842), and a recent addition includes stored tankers which extend down to Feeder Yard.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: craigandru</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15033</link>
		<dc:creator>craigandru</dc:creator>
		<pubDate>Fri, 20 May 2016 20:10:45 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15033</guid>
		<description>Nice catch, I remember shooting them here last summer - the PCHR is a fun day of railfanning and if you&#039;re lucky it&#039;s even better!  

Where are they starting their shifts these days?  Is it still down in Welland off Green Road South?</description>
		<content:encoded><![CDATA[<p>Nice catch, I remember shooting them here last summer &#8211; the PCHR is a fun day of railfanning and if you&#8217;re lucky it&#8217;s even better!  </p>
<p>Where are they starting their shifts these days?  Is it still down in Welland off Green Road South?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15030</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 20 May 2016 18:38:23 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15030</guid>
		<description>just lucky boyos. that is all. thanks Ryan :) more to come.</description>
		<content:encoded><![CDATA[<p>just lucky boyos. that is all. thanks Ryan <img src='http://www.railpictures.ca/wp-includes/images/smilies/icon_smile.gif' alt=':)' class='wp-smiley' />  more to come.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: DoctaPinklaces</title>
		<link>http://www.railpictures.ca/?attachment_id=24744#comment-15029</link>
		<dc:creator>DoctaPinklaces</dc:creator>
		<pubDate>Fri, 20 May 2016 18:36:44 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/05/TRRY_108_STRSCH_1046.jpg#comment-15029</guid>
		<description>Lakeshore was cut back in 2007, although service stopped up that way just before Trillium took over I&#039;m lead to believe.</description>
		<content:encoded><![CDATA[<p>Lakeshore was cut back in 2007, although service stopped up that way just before Trillium took over I&#8217;m lead to believe.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
