<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Canadian National Railway train M 36921, a long haul freight bound for Toronto&#8217;s MacMillan Yard from Chambord, Québec, is 8,376-feet (1179.5 meters) long.  Lead engine CN ET44AC 3117 (with a damaged left numberboard) and ES44AC 2888 are able to handle this train&#8217;s 56 loads and 72 empties (weighing 9,400 tons) with ease as it passes through the countryside near Newtonville, Ontario, on August 25, 2019.</title>
	<atom:link href="http://www.railpictures.ca/upload/canadian-national-railway-train-m-36921-a-long-haul-freight-bound-for-torontos-macmillan-yard-from-chambord-quebec-is-8376-feet-1179-5-meters-long-lead-engine-cn-et44ac-3117-with-a-damaged/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sat, 14 Nov 2026 02:43:13 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
