<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: CN 529 is almost finished its trip from Rouses Point as it heads through Montreal West towards its destination of Taschereau Yard a few miles away. It is two days worth of CP 931&#8242;s (CN picks it up from CP at Rouses Point, NY) and hence has four units rather than the usual two and 476 axles total (much heavier than usual). Power is a UP SD70M leading three NS units (UP 4875, NS 8868, NS 2778 &amp; NS 9518). At left on the transfer track is a long cut of grain cars, perhaps an entire grain train.</title>
	<atom:link href="http://www.railpictures.ca/upload/cn-529-is-almost-finished-its-trip-from-rouses-point-as-it-heads-through-montreal-west-towards-its-destination-of-taschereau-yard-a-few-miles-away-it-is-two-days-worth-of-cp-931s-cn-picks-it-up-fr/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sat, 18 Apr 2026 01:39:13 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
