	<title>Comments on: CN 5716 leads one of many delayed trains East on this very busy day. 310 the day prior had picked a switch and put a few autos on the ground just East of Trenton ( Belleville I believe ). Im guessing the switch is destined to be the replacement for whatever was damaged during the derailment. 

This day I still have written down, 38 trains on the Kingston, not including CP and Via, a personal record I will never beat.</title>
	<atom:link href="http://www.railpictures.ca/upload/cn-5716-leads-one-of-many-delayed-trains-east-on-this-very-busy-day-310-the-day-prior-had-picked-a-switch-and-put-a-few-autos-on-the-ground-just-east-of-trenton-belleville-i-believe-im-guessing/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Tue, 28 Apr 2026 02:38:28 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: Carson McGinness</title>
		<link>http://www.railpictures.ca/?attachment_id=42468#comment-41773</link>
		<dc:creator>Carson McGinness</dc:creator>
		<pubDate>Fri, 21 Aug 2020 23:49:59 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2020/08/DSC_0746.jpg#comment-41773</guid>
		<description>ngineered4u, thanks for the info! I was curious how they would have done that in such a short period of time ( less than a day ). I guess it was just a coincidence that a switch was going that way a day after it had happened.</description>
		<content:encoded><![CDATA[<p>ngineered4u, thanks for the info! I was curious how they would have done that in such a short period of time ( less than a day ). I guess it was just a coincidence that a switch was going that way a day after it had happened.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: ngineered4u</title>
		<link>http://www.railpictures.ca/?attachment_id=42468#comment-41771</link>
		<dc:creator>ngineered4u</dc:creator>
		<pubDate>Fri, 21 Aug 2020 20:27:51 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2020/08/DSC_0746.jpg#comment-41771</guid>
		<description>Great photo. Those SD70/75&#039;s are still the best units on CN in my humble opinion.
The pre built switch is not meant for the derailment site. Switches are complicated to build and all ones like this take awhile to construct. If derailments happen at a switch they are normally repaired on the spot or the track straight railed until a replacement is constructed.</description>
		<content:encoded><![CDATA[<p>Great photo. Those SD70/75&#8242;s are still the best units on CN in my humble opinion.<br />
The pre built switch is not meant for the derailment site. Switches are complicated to build and all ones like this take awhile to construct. If derailments happen at a switch they are normally repaired on the spot or the track straight railed until a replacement is constructed.</p>
]]></content:encoded>