<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: CN 5937 and CP 6030 begin to lift the rail from the Caso Sub. Work has been completed from just east of County Road 8 at the west end of the big curve and eastward to the switch just beyond the station at Essex. All the rail, with exception of road crossings, was towed to the east and clear of the Naylor Sideroad. Work will continue tomorrow (11/16/2012.</title>
	<atom:link href="http://www.railpictures.ca/upload/cn-5937-and-cp-6030-begin-to-lift-the-rail-from-the-caso-sub-work-has-been-completed-from-just-east-of-county-road-8-at-the-west-end-of-the-big-curve-and-eastward-to-the-switch-just-beyond-the-statio/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sat, 09 May 2026 00:56:47 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: headtailgrep</title>
		<link>http://www.railpictures.ca/?attachment_id=6497#comment-1037</link>
		<dc:creator>headtailgrep</dc:creator>
		<pubDate>Fri, 16 Nov 2012 01:54:21 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2012/11/CN5937-CP6030-at-ESSEX-111512.jpg#comment-1037</guid>
		<description>The CN-CP Niagara Detroit Partnership illustrated in its true form!</description>
		<content:encoded><![CDATA[<p>The CN-CP Niagara Detroit Partnership illustrated in its true form!</p>
]]></content:encoded>
	</item>
</channel>
</rss>
