<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: CNR 1266 and 1267 rest between shifts at the Ford Talbotville Assembly Plant November 1972</title>
	<atom:link href="http://www.railpictures.ca/upload/cnr-1266-and-1267-rest-between-shifts-at-the-ford-talbotville-assembly-plant-november-1972/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Mon, 22 Jun 2026 03:08:17 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: Oakvillesub5</title>
		<link>http://www.railpictures.ca/?attachment_id=27064#comment-17897</link>
		<dc:creator>Oakvillesub5</dc:creator>
		<pubDate>Sun, 27 Nov 2016 01:05:37 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/11/CN-1266-Talbotville-1a-11.72-RP.jpg#comment-17897</guid>
		<description>Great work, too bad Ford discontinued the Crown Vic, bad both for St. Thomas rail fans and the police force</description>
		<content:encoded><![CDATA[<p>Great work, too bad Ford discontinued the Crown Vic, bad both for St. Thomas rail fans and the police force</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: lonloco</title>
		<link>http://www.railpictures.ca/?attachment_id=27064#comment-17883</link>
		<dc:creator>lonloco</dc:creator>
		<pubDate>Sat, 26 Nov 2016 00:27:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/11/CN-1266-Talbotville-1a-11.72-RP.jpg#comment-17883</guid>
		<description>Nope always CN switching the Ford Plant. N&amp;W picked up finished cars and brought in many High Cubes of Auto Parts. Used Southwold yard for Interchange.</description>
		<content:encoded><![CDATA[<p>Nope always CN switching the Ford Plant. N&amp;W picked up finished cars and brought in many High Cubes of Auto Parts. Used Southwold yard for Interchange.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=27064#comment-17878</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 25 Nov 2016 22:47:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2016/11/CN-1266-Talbotville-1a-11.72-RP.jpg#comment-17878</guid>
		<description>Oooooh very nice. Did N&amp;W have their own switcher in this period or did CN do all the grunt work?</description>
		<content:encoded><![CDATA[<p>Oooooh very nice. Did N&#038;W have their own switcher in this period or did CN do all the grunt work?</p>
]]></content:encoded>
	</item>
</channel>
</rss>
