<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Construction of the GO East Rail Maintenance Facility progresses, with the west side railbeds partially installed,
 

   as VIA #6401 leads the mid morning J train,  #62  to Montreal and  #52 to Ottawa (with 6434 ) ,  slowing for the Oshawa station stop,


   and in the background the tail end of an auto parts / auto racks westbound exits the south service track  powered by a CN  8889 / 2191 / 5442   combo:  SD70M-2 /  Dash 8-40 CW  / SD60; 


   Image from the since removed Hopkins St overpass, Whitby, October 12, 2016 digital by S.Danko


   Noteworthy: 


The GM Oshawa plant ceased production December 2019. There will be a return of  auto parts/ racks action  (whether CP may be involved n/k ) at the renewed GM facility: pickup production is targeted to begin in January 2022 with the next-generation Chevrolet Silverado and GMC Sierra, including their heavy-duty variants.</title>
	<atom:link href="http://www.railpictures.ca/upload/construction-of-the-go-east-rail-maintenance-facility-progresses-with-the-west-side-railbeds-partially-installed-as-via-6401-leads-the-mid-morning-j-train-62-to-montreal-and-5/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Mon, 25 May 2026 18:35:34 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
