<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: CP 2292 with CP 2261 and UP 8594 roll through Guelph Junction eastward towards Toronto. A very interesting choice of power on todays CP 240 as the lead two GP20C-ECO&#8217;s have been the power for T69 for a few weeks. The manual switch stand at the left will soon be a thing of the past as well as the &#8220;Ham 1&#8243; track connection as they are not included in the Guelph Junction upgrade to the Hamilton Sub. The &#8220;Ham 2&#8243; has already been bypassed.</title>
	<atom:link href="http://www.railpictures.ca/upload/cp-2292-with-cp-2261-and-up-8594-roll-through-guelph-junction-eastward-towards-toronto-a-very-interesting-choice-of-power-on-todays-cp-240-as-the-lead-two-gp20c-ecos-have-been-the-power-for-t69-fo/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 07 May 2026 18:00:21 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: Bill Purdy</title>
		<link>http://www.railpictures.ca/?attachment_id=30923#comment-23643</link>
		<dc:creator>Bill Purdy</dc:creator>
		<pubDate>Sat, 14 Oct 2017 16:57:39 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2017/10/IMG_0069-3.jpg#comment-23643</guid>
		<description>They are rerouting the whole bend and removing the switch and all access to &#039;Ham 1&quot;. Track speed will be 25mph through this area. The switch from Hamilton to the Galt eastbound and westbound will be RTC controlled instead of manually done by conductors.</description>
		<content:encoded><![CDATA[<p>They are rerouting the whole bend and removing the switch and all access to &#8216;Ham 1&#8243;. Track speed will be 25mph through this area. The switch from Hamilton to the Galt eastbound and westbound will be RTC controlled instead of manually done by conductors.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: snake</title>
		<link>http://www.railpictures.ca/?attachment_id=30923#comment-23640</link>
		<dc:creator>snake</dc:creator>
		<pubDate>Sat, 14 Oct 2017 12:27:06 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2017/10/IMG_0069-3.jpg#comment-23640</guid>
		<description>You mean they are just removing these connecting tracks to get rid of the switches?</description>
		<content:encoded><![CDATA[<p>You mean they are just removing these connecting tracks to get rid of the switches?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Marcus Stevens</title>
		<link>http://www.railpictures.ca/?attachment_id=30923#comment-23635</link>
		<dc:creator>Marcus Stevens</dc:creator>
		<pubDate>Sat, 14 Oct 2017 02:10:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2017/10/IMG_0069-3.jpg#comment-23635</guid>
		<description>Nice shot! I got him in Streetsville. I see new signals going up on the Hamilton sub. At the junction as well.</description>
		<content:encoded><![CDATA[<p>Nice shot! I got him in Streetsville. I see new signals going up on the Hamilton sub. At the junction as well.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
