<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Having just finished its early morning switching duties at the Chrysler Assembly Plant in Brampton, the power of CN L579 is seen paused just west of the Airport Road overpass while awaiting permission from the CN RTC at BIT to run back down the Pullback Siding (against the Yard Tramp using it as a pullback) so they can re-couple on to the loaded autoracks which they pulled out of Chrysler just before dawn (and spotted on one of the yard tracks at BIT). From there they will take the loaded autoracks to Mac Yard and call it a day. Time was 07:25</title>
	<atom:link href="http://www.railpictures.ca/upload/having-just-finished-its-early-morning-switching-duties-at-the-chrysler-assembly-plant-in-brampton-the-power-of-cn-l579-is-seen-paused-just-west-of-the-airport-road-overpass-while-awaiting-permission/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sat, 09 May 2026 00:56:47 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
