<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Heading eastbound into the city after dipping under the Queen Elizabeth Way overpass, GO Transit GP40TC 500 speeds through the Swansea area of Toronto with a 7 bilevel Lakeshore West train bound for Union Station. One can see the water tower for the Mr. Christie Lakeshore Bakery in the background, and part of the Oshawa Group warehouse (next to the Ontario Food Terminal) on the right. The signals for the Mimico East interlocking are visible in the distance.

Original photographer unknown, Dan Dell&#8217;Unto collection slide.</title>
	<atom:link href="http://www.railpictures.ca/upload/heading-eastbound-into-the-city-after-dipping-under-the-queen-elizabeth-way-overpass-go-transit-gp40tc-500-speeds-through-the-swansea-area-of-toronto-with-a-7-bilevel-lakeshore-west-train-bound-for-u/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Mon, 22 Jun 2026 03:08:17 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
