<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: In 1995, Canadian Pacific closed the Connaught Tunnel route to allow deepening the tunnel to accommodate double-stacked container trains, requiring the Macdonald Track to carry both eastward and westward traffic, including Rocky Mountaineer passenger trains.  On Wednesday 1995-08-09, eastward GCRC 7488 crossed the Bear Creek bridge at Macdonald Track mileage 78.7M at 1433 PDT, just before entering the Shaughnessy Tunnel.</title>
	<atom:link href="http://www.railpictures.ca/upload/in-1995-canadian-pacific-closed-the-connaught-tunnel-route-to-allow-deepening-the-tunnel-to-accommodate-double-stacked-container-trains-requiring-the-macdonald-track-to-carry-both-eastward-and-westw/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Tue, 22 Sep 2026 12:34:40 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
