<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Meet at Moffat, it seems the GEXR Guelph Junction Railway daily schedule lately is calling for the second job to run a bit later, lately often having the two jobs meeting at Guelph Junction or on the siding at Moffat. This day the second job had a lift to do while the first job had a set off, so the meet worked well finding the conductor of the second job performing all the switching help for both trains before heading north. It was also nice catching one of the slugs active again after being sidelined for a bit.</title>
	<atom:link href="http://www.railpictures.ca/upload/meet-at-moffat-it-seems-the-gexr-guelph-junction-railway-daily-schedule-lately-is-calling-for-the-second-job-to-run-a-bit-later-lately-often-having-the-two-jobs-meeting-at-guelph-junction-or-on-the/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Sun, 26 Apr 2026 19:33:30 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
