<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: More Ch-Ch-Ch-Ch-Changes. A few new signals have sprouted at James St North &#8211; and crews are still busy building the parking garage/station and  platform. Apparently they want to squeeze some GO service in here in a months time&#8230; after all all you need is a platform and a staircase.. right?? I say no way it&#8217;ll make it in time &#8211; but then again, stranger things have happened with GO expansion..
The signal at far left &#8211; protects the main track &#8211; wouldn&#8217;t Rule 27 apply requiring a 564 (Authority to pass &#8211; most restrictive signal would be red!). Normally you&#8217;d expect the signal to be turned unless commissioning was imminent..</title>
	<atom:link href="http://www.railpictures.ca/upload/more-ch-ch-ch-ch-changes-a-few-new-signals-have-sprouted-at-james-st-north-and-crews-are-still-busy-building-the-parking-garagestation-and-platform-apparently-they-want-to-squeeze-some-go-servic/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 16 Apr 2026 10:49:57 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=19108#comment-9349</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Mon, 01 Jun 2015 00:36:54 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2015/05/RPCA_97_SOR_James_St_North_STRSCH_5838.jpg#comment-9349</guid>
		<description>So this control point is now in service - CN &quot;Stuart&quot; is the name, went in service 0300 on Saturday May 30th.</description>
		<content:encoded><![CDATA[<p>So this control point is now in service &#8211; CN &#8220;Stuart&#8221; is the name, went in service 0300 on Saturday May 30th.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=19108#comment-9320</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 29 May 2015 00:22:45 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2015/05/RPCA_97_SOR_James_St_North_STRSCH_5838.jpg#comment-9320</guid>
		<description>Yes Daniel, that is pure fantasy. VIA will not use it as a hub, period. That&#039;s what Aldershot is.

They won&#039;t ever go back. I have my doubts VIA will use the station either. They should.. 

Niagara trains will bypass Hamilton for now - how many sides do you want to disembark from? Each side has to be prepared and ready with a platform - do you want to create two platforms or one on time for June?</description>
		<content:encoded><![CDATA[<p>Yes Daniel, that is pure fantasy. VIA will not use it as a hub, period. That&#8217;s what Aldershot is.</p>
<p>They won&#8217;t ever go back. I have my doubts VIA will use the station either. They should.. </p>
<p>Niagara trains will bypass Hamilton for now &#8211; how many sides do you want to disembark from? Each side has to be prepared and ready with a platform &#8211; do you want to create two platforms or one on time for June?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Daniel Odette</title>
		<link>http://www.railpictures.ca/?attachment_id=19108#comment-9319</link>
		<dc:creator>Daniel Odette</dc:creator>
		<pubDate>Thu, 28 May 2015 02:26:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2015/05/RPCA_97_SOR_James_St_North_STRSCH_5838.jpg#comment-9319</guid>
		<description>I could see GO having a temporary pedestrian level crossing, like the ones at Bradford. The project does look very rushed as you mentioned though. From rumours I&#039;ve heard, the Niagara GO excursion trains will simply glide past the station when it&#039;s done, which baffles me. It would be interesting if Via Rail used it as a mini-hub for Niagara and London-Windsor trains, but that&#039;s just fantasy.</description>
		<content:encoded><![CDATA[<p>I could see GO having a temporary pedestrian level crossing, like the ones at Bradford. The project does look very rushed as you mentioned though. From rumours I&#8217;ve heard, the Niagara GO excursion trains will simply glide past the station when it&#8217;s done, which baffles me. It would be interesting if Via Rail used it as a mini-hub for Niagara and London-Windsor trains, but that&#8217;s just fantasy.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: BradKetchen</title>
		<link>http://www.railpictures.ca/?attachment_id=19108#comment-9306</link>
		<dc:creator>BradKetchen</dc:creator>
		<pubDate>Tue, 26 May 2015 11:59:12 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2015/05/RPCA_97_SOR_James_St_North_STRSCH_5838.jpg#comment-9306</guid>
		<description>Not soon enough. I&#039;ll be on the Stuart street bridge today taking pics after bussing it in from Aldershot (train from Toronto).</description>
		<content:encoded><![CDATA[<p>Not soon enough. I&#8217;ll be on the Stuart street bridge today taking pics after bussing it in from Aldershot (train from Toronto).</p>
]]></content:encoded>
	</item>
</channel>
</rss>
