<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Niagara-bound VIA train 97 has VIA 6412 (F40PH-3) leading Amtrak P42dc AMTK 108 and five Metroliner coaches out of Aldershot station on track 2 at 10:18 AM, about an hour and a quarter behind schedule. 
To Amtrak this is train 64, normally running with all-Amtrak equipment to final destination New York City. It appears that AMTK 108 has a problem this day, so VIA 6412 will lead train 97 at least as far as Niagara Falls Ontario. 
Note the distance between Aldershot station and its platforms; with Track 1 now dedicated to CN freight, VIA trains use middle platform 2-3, while platform 4 serves GO Transit&#8217;s pocket track. 
The orange pails and boards mark a work site above a small creek / drainage channel that runs under the tracks.</title>
	<atom:link href="http://www.railpictures.ca/upload/niagara-bound-via-train-97-has-via-6412-f40ph-3-leading-amtrak-p42dc-amtk-108-and-five-metroliner-coaches-out-of-aldershot-station-on-track-2-at-1018-am-about-an-hour-and-a-quarter-behind-schedule/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Wed, 04 Nov 2026 12:37:26 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: ngineered4u</title>
		<link>http://www.railpictures.ca/?attachment_id=35027#comment-29171</link>
		<dc:creator>ngineered4u</dc:creator>
		<pubDate>Fri, 05 Oct 2018 20:13:15 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2018/10/via6412+amtk10897_AldershotON_2018-0928.jpg#comment-29171</guid>
		<description>Oops! Right you are CNCNDR. One year away from my beloved locomotives and I fall to pieces :-(</description>
		<content:encoded><![CDATA[<p>Oops! Right you are CNCNDR. One year away from my beloved locomotives and I fall to pieces <img src='http://www.railpictures.ca/wp-includes/images/smilies/icon_sad.gif' alt=':-(' class='wp-smiley' /> </p>
]]></content:encoded>
	</item>
	<item>
		<title>By: CNCNDR</title>
		<link>http://www.railpictures.ca/?attachment_id=35027#comment-29170</link>
		<dc:creator>CNCNDR</dc:creator>
		<pubDate>Fri, 05 Oct 2018 19:16:52 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2018/10/via6412+amtk10897_AldershotON_2018-0928.jpg#comment-29170</guid>
		<description>You mean KA30, Phil? JC30 is Port Rob.</description>
		<content:encoded><![CDATA[<p>You mean KA30, Phil? JC30 is Port Rob.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: ngineered4u</title>
		<link>http://www.railpictures.ca/?attachment_id=35027#comment-29118</link>
		<dc:creator>ngineered4u</dc:creator>
		<pubDate>Thu, 04 Oct 2018 16:20:03 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2018/10/via6412+amtk10897_AldershotON_2018-0928.jpg#comment-29118</guid>
		<description>#97 is sitting on track 2 of the Oakville Sub. The track to the right of the train is #1 and the track with the cones on either side is JC30 in Aldershot yard.
The pocket track is not considered a fourth track by the railway.
#1 and #2 tracks are 8 feet apart, where as #3 track is farther apart near the platform because of a station structure there.</description>
		<content:encoded><![CDATA[<p>#97 is sitting on track 2 of the Oakville Sub. The track to the right of the train is #1 and the track with the cones on either side is JC30 in Aldershot yard.<br />
The pocket track is not considered a fourth track by the railway.<br />
#1 and #2 tracks are 8 feet apart, where as #3 track is farther apart near the platform because of a station structure there.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: jknott86</title>
		<link>http://www.railpictures.ca/?attachment_id=35027#comment-29094</link>
		<dc:creator>jknott86</dc:creator>
		<pubDate>Thu, 04 Oct 2018 00:16:41 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2018/10/via6412+amtk10897_AldershotON_2018-0928.jpg#comment-29094</guid>
		<description>6412 came back on the year of the Toronto-bound train later that day</description>
		<content:encoded><![CDATA[<p>6412 came back on the year of the Toronto-bound train later that day</p>
]]></content:encoded>
	</item>
</channel>
</rss>
