<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Q148 slides by on the south as L580&#8242;s power is being tied down and tidied up by the crew, having just returned from the Burford Spur. In the background, track guys are using a boom truck with a magnet to transfer tie plates from a gon to bins on the boom truck deck. As Q148 was going by M301 slipped by on the north track. I enjoyed some good company on the platform too.</title>
	<atom:link href="http://www.railpictures.ca/upload/q148-slides-by-on-the-south-as-l580s-power-is-being-tied-down-and-tidied-up-by-the-crew-having-just-returned-from-the-burford-spur-in-the-background-track-guys-are-using-a-boom-truck-with-a-magne/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Thu, 07 May 2026 22:12:28 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: BradKetchen</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60388</link>
		<dc:creator>BradKetchen</dc:creator>
		<pubDate>Fri, 08 Mar 2024 17:27:23 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60388</guid>
		<description>So that project wouldn&#039;t be on Ingenium&#039;s wallet obviously. ;) Still amazed a wee trackmobile handles all those cars!</description>
		<content:encoded><![CDATA[<p>So that project wouldn&#8217;t be on Ingenium&#8217;s wallet obviously. <img src='http://www.railpictures.ca/wp-includes/images/smilies/icon_wink.gif' alt=';)' class='wp-smiley' />  Still amazed a wee trackmobile handles all those cars!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: rsmith</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60385</link>
		<dc:creator>rsmith</dc:creator>
		<pubDate>Fri, 08 Mar 2024 17:00:19 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60385</guid>
		<description>No room for a roundabout there</description>
		<content:encoded><![CDATA[<p>No room for a roundabout there</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60384</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Fri, 08 Mar 2024 15:56:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60384</guid>
		<description>Wild That won&#039;t be a cheap project. They must have plans or a need to re-build Clarence St. There&#039;s talks of roundabouts, but most of the discussions are behind closed session of council.</description>
		<content:encoded><![CDATA[<p>Wild That won&#8217;t be a cheap project. They must have plans or a need to re-build Clarence St. There&#8217;s talks of roundabouts, but most of the discussions are behind closed session of council.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: rsmith</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60381</link>
		<dc:creator>rsmith</dc:creator>
		<pubDate>Thu, 07 Mar 2024 22:56:48 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60381</guid>
		<description>@Steve - most likely to move the Burford Spur off of Clarence St., south of Colborne St. Track would be aligned along the boulevard rather than across the traffic lanes.</description>
		<content:encoded><![CDATA[<p>@Steve &#8211; most likely to move the Burford Spur off of Clarence St., south of Colborne St. Track would be aligned along the boulevard rather than across the traffic lanes.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: terry.oshell</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60377</link>
		<dc:creator>terry.oshell</dc:creator>
		<pubDate>Thu, 07 Mar 2024 14:58:25 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60377</guid>
		<description>Brad, I was at Mile 23 at the time, based on what I overheard on the radio 580 spotted the cars at the derail which is on the north side of Grey St., then returned to the yard.</description>
		<content:encoded><![CDATA[<p>Brad, I was at Mile 23 at the time, based on what I overheard on the radio 580 spotted the cars at the derail which is on the north side of Grey St., then returned to the yard.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Stephen C. Host</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60376</link>
		<dc:creator>Stephen C. Host</dc:creator>
		<pubDate>Thu, 07 Mar 2024 14:50:33 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60376</guid>
		<description>The rail line is owned by Ingenia Polymers and they contract operations and maintenance of the rail line out, in 2018 to Allied Track Services.

I&#039;m curious, what this is all about

&quot;2427811 Ontario Inc. (Ingenia Polymers Corp.) – Request for
Instructions Re: Land Exchange and Rail Line Realignment (LO2020-
007)&quot;</description>
		<content:encoded><![CDATA[<p>The rail line is owned by Ingenia Polymers and they contract operations and maintenance of the rail line out, in 2018 to Allied Track Services.</p>
<p>I&#8217;m curious, what this is all about</p>
<p>&#8220;2427811 Ontario Inc. (Ingenia Polymers Corp.) – Request for<br />
Instructions Re: Land Exchange and Rail Line Realignment (LO2020-<br />
007)&#8221;</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: BradKetchen</title>
		<link>http://www.railpictures.ca/?attachment_id=54022#comment-60375</link>
		<dc:creator>BradKetchen</dc:creator>
		<pubDate>Thu, 07 Mar 2024 14:06:48 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2024/03/Dundas-Sub-Mile-23.0-Brantford-Q148-CN-5764-UP-8697-L-580-GTW-5824-GTW-5849-March-5-2024-TJO-Photo-1Erpca-.jpg#comment-60375</guid>
		<description>580&#039;s power didn&#039;t proceed down the Burford Spur to Ingenium did they Terry? I was just looking yesterday at Ingenium on Google Earth and there&#039;s a good load cars down there. Even a cut at 8 at the stub end tracks that lead to the past the station beyond. That many cars seems a lot for a track mobile as Ingenium has been using. Is it possible? :)</description>
		<content:encoded><![CDATA[<p>580&#8242;s power didn&#8217;t proceed down the Burford Spur to Ingenium did they Terry? I was just looking yesterday at Ingenium on Google Earth and there&#8217;s a good load cars down there. Even a cut at 8 at the stub end tracks that lead to the past the station beyond. That many cars seems a lot for a track mobile as Ingenium has been using. Is it possible? <img src='http://www.railpictures.ca/wp-includes/images/smilies/icon_smile.gif' alt=':)' class='wp-smiley' /> </p>
]]></content:encoded>
	</item>
</channel>
</rss>
