<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Testing the corridor, VIA 688 &#8220;Charges&#8221; away from Guelph Downtown with a Venture trainset. Testing all corridor stations in Ontario except the Strathroy Sub, not until acceptance testing is completed (which is a multi month process) will the units receive VIA marks and VIA ownership. Hence why they are still SIXX reporting marks, indicating Siemens ownership.</title>
	<atom:link href="http://www.railpictures.ca/upload/testing-the-corridor-via-688-charges-away-from-guelph-downtown-with-a-venture-trainset-testing-all-corridor-stations-in-ontario-except-the-strathroy-sub-not-until-acceptance-testing-is-complete/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Fri, 10 Apr 2026 14:13:47 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
	<item>
		<title>By: First954</title>
		<link>http://www.railpictures.ca/?attachment_id=48760#comment-51968</link>
		<dc:creator>First954</dc:creator>
		<pubDate>Sat, 14 May 2022 12:26:03 +0000</pubDate>
		<guid isPermaLink="false">http://www.railpictures.ca/wp-content/uploads/2022/05/RPCA_688_STRSCH_4445-copy.jpg#comment-51968</guid>
		<description>Beautiful looking equipment.  But I question the introduction of semi-permanently coupled 5 car &quot;train sets.&quot;  Doesn&#039;t anyone remember the introduction of the 5 car sets of Tempo equipment.  It was almost overnight that CN realized they need only 3 cars on some runs and 8+ on others.  Where is the flexibility with this equipment?  It is great to see VIA purchasing new equipment, but is that what the market really needs?  Time will tell.  Great pictured though!!</description>
		<content:encoded><![CDATA[<p>Beautiful looking equipment.  But I question the introduction of semi-permanently coupled 5 car &#8220;train sets.&#8221;  Doesn&#8217;t anyone remember the introduction of the 5 car sets of Tempo equipment.  It was almost overnight that CN realized they need only 3 cars on some runs and 8+ on others.  Where is the flexibility with this equipment?  It is great to see VIA purchasing new equipment, but is that what the market really needs?  Time will tell.  Great pictured though!!</p>
]]></content:encoded>
	</item>
</channel>
</rss>
