<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: The CP Hoadley sub was quite inactive between 2008-2010, until major work had been done replacing ties and putting down some new ballast. This is a shot of the work train from which ties were unloaded by a crane to be replaced later. The quality of the track prior to tie replacement is evident. Also, the train was going at literally 1 mph so the crane operator would have adequate time to pick up ties from the car ahead and drop them onto the ground where required.</title>
	<atom:link href="http://www.railpictures.ca/upload/the-cp-hoadley-sub-was-quite-inactive-between-2008-2010-until-major-work-had-been-done-replacing-ties-and-putting-down-some-new-ballast-this-is-a-shot-of-the-work-train-from-which-ties-were-unloaded/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Fri, 10 Apr 2026 20:24:34 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
