<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: The SOR Garnet Yard day job with QGCY 2301 and RLK 4095 are trailing a block of coil cars for Stelco and a block of tanks for Imperial Oil has slowly made its way south from Garnet Yard and is stopped at Mile 0.00 Hagersville Sub. at Nanticoke the junction with the Stelco Spur and Hydro Spur. The crew is waiting the arrival of GEXR 2303 (Imperial Oil Job) which is behind the photographer running light northbound on the Hydro Spur. The crew has lined the switch for the Stelco Spur, after a job briefing between crews QCRY 2301 and RLK 4095 will head south with the block of coil cars on the Stelco Spur, having cut-off the block of tanks to be lifted by GEXR 2303.</title>
	<atom:link href="http://www.railpictures.ca/upload/the-sor-garnet-yard-day-job-with-qgcy-2301-and-rlk-4095-are-trailing-a-block-of-coil-cars-for-stelco-and-a-block-of-tanks-for-imperial-oil-has-slowly-made-its-way-south-from-garnet-yard-and-is-stopped/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Fri, 08 May 2026 02:57:22 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
