<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: This afternoon trackside started out on the CN where eastbounds were being told they were going in the hole for at least 5 westbounds out of Saskatoon. However I got distracted by this CP when I overheard an interesting conversation. It was centred around the second unit (NS 1057) needing to be repositioned &#8220;behind the first trailing unit&#8221;. Obviously this brought about some confusion as the NS 1057 was the only trailing unit. &#8220;Do you mean behind the first robot&#8221; the engineer eventually asked. Around this time I heard them go over the detector &#8220;total axles 8-4-0&#8243;, and it all started to make sense. They were going to reconfigure the power arrangement from 2x1x1 to 1x2x1 on a double empty crude oil train. The plan was for them to this at the siding at Winter while 466 waited between switches on the main. Needless to say I got my shot and went back over to CN where things were actually moving.</title>
	<atom:link href="http://www.railpictures.ca/upload/this-afternoon-trackside-started-out-on-the-cn-where-eastbounds-were-being-told-they-were-going-in-the-hole-for-at-least-5-westbounds-out-of-saskatoon-however-i-got-distracted-by-this-cp-when-i-overh/feed" rel="self" type="application/rss+xml" />
	<link>http://www.railpictures.ca</link>
	<description>The BEST Canadian photos on the Internet, eh?</description>
	<lastBuildDate>Tue, 26 May 2026 05:18:52 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
</channel>
</rss>
