Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



A heavy train crosses northward over the Grand River at the Freeport bridge on the former Grand River Railway enroute to the GEXR (CN) interchange. It's any wonder how long these three 8200 series GP9's will last with the GP20ECO invasion well under way.
Copyright Notice: This image ©Stephen C. Host all rights reserved.



Caption: A heavy train crosses northward over the Grand River at the Freeport bridge on the former Grand River Railway enroute to the GEXR (CN) interchange. It's any wonder how long these three 8200 series GP9's will last with the GP20ECO invasion well under way.

Photographer:
Stephen C. Host [1500] (more) (contact)
Date: 10/20/2013 (search)
Railway: Canadian Pacific (search)
Reporting Marks: CP 8245 (search)
Train Symbol: TH11 (search)
Subdivision/SNS: Waterloo Subdivision (search)
City/Town: Cambridge (Freeport) (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=12029
Click here to Log-in or Register and add your vote.

10 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1909 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 11016

Map courtesy of Open Street Map

Full size | Suncalc
Note: Read why maps changed. Suncalc.net for reference only.

All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

6 Comments
  1. Its a wonder how long the ex-Grand River Railway will continue to exist with one car for delivery. ;)
    I suspect they will be pulling a larger cut of cars from GEXR or other industries on the line with 3 Geeps for power?

  2. It will – this crew was probably headed to triple metal to lift loads and spot this empty – then go to GEXR to lift about 20 cars from the interchange. Empty autoracks are picked up and loaded are dropped off once per day – there are two shifts per day on the Grand River Railway hagey job – Toyota makes this a very important part of the line – the CN cars are just as hot as the CP’s.

  3. A bigger threat to this operation is the Waterloo Regional LRT scheduled for later this decade.

  4. The main reason for three geeps is the mountain grades on this line – two sections of 2.0 percent and a decent grade going into Toyota proper which is this jobs raison d’etre. Wet leaves, snow make it difficult for just two.

  5. great shot steve. ill send some more of my photos soon. love your work.

  6. Thank you Jude. You are so kind :)

Railpictures.ca © 2006-2023 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us