Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



GMTX 333 sits locked up in the yard at Orangeville, two tracks full of hoppers, maybe plastic pellets destined for Clorox, a contractor tidies up old ties. This sure looks like a viable railway to me. Who would think that in a little more than 12 month the end would come.
Copyright Notice: This image ©Terry O'Shell all rights reserved.



Caption: GMTX 333 sits locked up in the yard at Orangeville, two tracks full of hoppers, maybe plastic pellets destined for Clorox, a contractor tidies up old ties. This sure looks like a viable railway to me. Who would think that in a little more than 12 month the end would come.

Photographer:
Terry O'Shell [127] (more) (contact)
Date: 11/02/2020 (search)
Railway: Orangeville-Brampton Railway (search)
Reporting Marks: GMTX 333 (search)
Train Symbol: Not Provided
Subdivision/SNS: Orangeville, OBRY Owen Sound Spur (search)
City/Town: Orangeville (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=50245
Click here to Log-in or Register and add your vote.

10 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 558 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 48956

Map courtesy of Open Street Map

Full size | Suncalc
Note: Read why maps changed. Suncalc.net for reference only.

All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

One Comment
  1. It was viable except the underlying lands had become gold.

    The value of the land far exceeded any return you could get from any railway operation in a private world. Any shortline would have to pay $30m and even then, given financing, return on equity, you need $1.5M revenue JUST to cover interest on a 30M loan (assuming 0 equity was put in) and then you want profit on top of that, $1.5M profit annually is a minimum of what they would be expecting…. assuming 5% loan and 5% return on equity (5% is very very poor BTW)

    in other words, the railway had overstayed their welcome financially speaking and there was no other way other than continuing to run it. No one would have bought it or paid that much.

    So seeing that no one would buy the railway as is, the town cashed in their casino chips and tore down the casino after doing so.

    It was sold for land value, and you can 100% thank Ontario’s amendment to the Ontario Shortline Railway Act that eliminated any need to continue operating a rail line under provincial control. If it wasn’t for that they wouldn’t have had the option without going through a long process….

    the act changes allow any non Federal railway company in Ontario to do the same thing. No matter how profitable. They can in fact just shut down a railway and say “sorry, see ya”.

Railpictures.ca © 2006-2023 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us