Caption: Trouble on the Dunnville Sub.
55 years ago today on October 28, 1971 CN's Dunnville Sub. was blocked by a freight train derailment near Canfield, ON.
Working on the Jarvis section crew at the time, we worked three consecutive days to repair the track damage from the derailment and cleanup process.
It was great working with a pair of CN wrecking cranes at the site.
In today's world, the line would have been cleared in just a few hours.
|
CN 50014 (became Ivaco Steel IVXX 50014) is an Industrial Works 200-ton wrecking crane, serial number 5137, built in 1928. It was scrapped at Ivaco Steel in L’Orignal, ON in June 1991.
http://www.railpictures.ca/?attachment_id=56779 <br.
CN 50073 is an Industrial Works 120-ton wrecking crane, serial number 3881, built in 1920. It was off CN's roster by July 1991.
Interesting shot, Paul. Was traffic rerouted during the cleanup? If so, over which line(s)?
Too many years ago to recall what, if any reroutes took place.
If there were any, they would possibly have been Brantford to Caledonia (Dunnville Sub.) then Caledonia to Jarvis (Hagersville Sub.) and Jarvis to Canfield Jct. (Cayuga Sub.)
Just a guess.
Was this a typical working arrangement for two wreck cranes? Back to Back? I thought they would face each other from both ends of the wreck and work towards each other.
Yes, normal wrecking has the cranes working towards each other cleaning up the derailed cars.
I snapped the cranes turned back-to-back when they were being pulled into the clear at Canfield Jct. to allow for some train movement.