|
Caption: For the fourth time in six years, GIO Rail trackage is used as a film location. The previous being Handmaids Tale in 2020 and 2023, and a Mr Beast challenge in 2024. This time, the former Cayuga Subdivision trackage in Dain City is being used for the Amazon series Reacher. Here we see a station erected for filming a scene at the fictional "Mothers Rest" station. VIA lent a F40 and a few coaches for the train used in said scene. The train was left under scaffolding where GIO generally keeps their power at Feeder, making it difficult to get a photo. After filming, the station was destroyed. One of the GIO guys I talked to suggested using it for an office, but the higher ups must've not shared the same idea.
|
More or all to do with City Planning & Development, temporary / use provisions and building codes, etc.
A shame to see all of those building materials go to waste, but it probably wasn’t built to any Codes or to withstand a Canadian winter.
I talked to the crews that built the structure. It was a prefabricated and premade trailer building with modifications, and the crews constructed the platform out of wood once the main structure was put in place.
It’s amazing what labour can do when it’s for a movie – how fast it goes up and how fast it goes down. Anything for a movie…
The biggest issue with keeping it is maintenance – plus as Glenn said building codes, etc which were obviously not met with this structure was made.
I did talk about a few other things and they also indicated that much of what they have is kept and re-used in other productions. If they have plans to come back I imagine this ‘station’ will be ready to go for future years