Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Canadian National Railway train M 36921, a long haul freight bound for Toronto's MacMillan Yard from Chambord, Québec, is 8,376-feet (1179.5 meters) long.  Lead engine CN ET44AC 3117 (with a damaged left numberboard) and ES44AC 2888 are able to handle this train's 56 loads and 72 empties (weighing 9,400 tons) with ease as it passes through the countryside near Newtonville, Ontario, on August 25, 2019.
Copyright Notice: This image ©Craig Walker all rights reserved.



Caption: Canadian National Railway train M 36921, a long haul freight bound for Toronto's MacMillan Yard from Chambord, Québec, is 8,376-feet (1179.5 meters) long. Lead engine CN ET44AC 3117 (with a damaged left numberboard) and ES44AC 2888 are able to handle this train's 56 loads and 72 empties (weighing 9,400 tons) with ease as it passes through the countryside near Newtonville, Ontario, on August 25, 2019.

Photographer:
Craig Walker [22] (more) (contact)
Date: 08/25/2019 (search)
Railway: Canadian National (search)
Reporting Marks: CN 3117 (search)
Train Symbol: CN 369 (search)
Subdivision/SNS: Kingston Subdivision (search)
City/Town: Newtonville (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=38832
Click here to Log-in or Register and add your vote.

2 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 2078 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 37639

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.
No comments yet, be the first by adding yours below

Railpictures.ca © 2006-2026 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us