Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



It's a day you wouldn't think would be typical for plowing. The temperature is hovering a few degrees about freezing, rain is forecasted, yet a plow extra was called to flange the snow banks back from Stratford to Goderich. After the morning long venture from Stratford, the GEXR crew associated with the plow pauses just south of the yard in Goderich to clear the snow caked onto ex CN plow 55413.
Copyright Notice: This image ©David Young all rights reserved.



Caption: It's a day you wouldn't think would be typical for plowing. The temperature is hovering a few degrees about freezing, rain is forecasted, yet a plow extra was called to flange the snow banks back from Stratford to Goderich. After the morning long venture from Stratford, the GEXR crew associated with the plow pauses just south of the yard in Goderich to clear the snow caked onto ex CN plow 55413.

Photographer:
David Young [276] (more) (contact)
Date: 02/07/2009 (search)
Railway: Rail America (search)
Reporting Marks: GEXR 55413 (search)
Train Symbol: GEXR X518 (search)
Subdivision/SNS: Goderich, GEXR Goderich Subdivision (search)
City/Town: Goderich (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=15138
Click here to Log-in or Register and add your vote.

4 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 2101 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 14113

Map courtesy of Open Street Map

Full size | Suncalc
Note: Read why maps changed. Suncalc.net for reference only.

All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

2 Comments
  1. This photo brings back memeories of my days on CP working snowplows. The flange is the part between the rails. If that is not removed, the packed snow can exert pressure on the wheels, like hump yard retarders.

    After sucessive snowfalls, we used to stall sometimes approaching Guelph Jct on the CP when there was still a current of traffic, until the plow was run to clear out the flange.

    All westbounds would use north track and never get going fast enough to blow the snow out. It was also a good idea to “wing” out the snowbanks on each side so crews could walk the train if needed. Also, packed snow on the sides especially at crossings (pushed on there by the highway plow) sometimes pulled pins if the slack ran in on an elevated curve and the lever was slightly sticking out.

    We often had plows in this type of weather to make the sure that the snow was well back before getting rain soaked and then freezing later. In that case it would be like cement once frozen.

  2. Thanks Ronald – excellent explanation. On this day (I was photographing too, Ron and I were following each other in our cars inadvertently!)it was already warm and the cold spell arrived the night before.

    http://www.railpictures.ca/?attachment_id=13418

    It caused quite a mess as the plow got stuck twice…

    Lots of plow shots posted this past winter – have a look. From January to February this year if you have not seen.

Railpictures.ca © 2006-2023 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us